Charging that is actually there.
Every point below reports its own health to our operations centre. If a connector cannot deliver a session, it takes itself off the map before you can drive to it.
3 locations. 20 points.
Punjab first, then the corridors that connect it. Hover any marker for site detail.
- 8 points
Bathinda
Dabwali Road Energy Hub
- 6 points
Mohali
Sector 80 Charging Station
- 6 points
Delhi–Katra Corridor
Delhi–Katra Expressway Stop
The only metric worth publishing.
We count a connector as unavailable from the second it stops being able to deliver a session to the second it can again — including grid outages, which are outside our control but very much inside your experience.
99%
Measured uptime
Rolling 30 days, all connectors
4h
Mean time to repair
From fault detection to session-ready
90s
First response
Average, on call and in-app
Every connector your vehicle knows.
OCPP 2.0.1 native, ISO 15118 plug-and-charge ready, and built for bidirectional energy from day one.
CCS2
Cars, SUVs and light commercial
60 – 240 kW
On every hub
CHAdeMO
Older imports and select fleets
50 – 60 kW
Where demand justifies it
Type-2 AC
Destination and overnight charging
7.4 – 22 kW
On every hub
Light EV
Two and three-wheelers
1.5 – 3.3 kW
Standard at city sites
Depot charging that nobody has to think about.
Overnight AC banks with dynamic load balancing, priority slots on the public network, consolidated monthly invoicing and a single escalation line for your operations desk.
- Post-paid fleet accounts
- Per-vehicle usage reporting
- Tariff-aware overnight scheduling
- Priority bays at partner hubs
Five steps. About
twenty minutes.
No membership card, no app-store detour, no calling a number on a sticker. Pull in, plug in, drive out.
- 01
Locate a Station
Open the app and see live availability, connector type and real-time pricing within a few kilometres.
- 02
Plug In
Park, lift the connector, and let the handshake do the rest. CCS2, CHAdeMO and Type-2 on every hub.
- 03
Charge
Watch the session live — power curve, state of charge and a genuinely accurate finish time.
- 04
Pay
Session ends, payment settles automatically through UPI or your saved method. GST invoice included.
- 05
Drive Away
Unplug and go. Your charging history, spend and carbon offset stay synced across devices.
What every Chargatt hub ships with.
Fast Charging
Up to 240 kW of liquid-cooled DC output. A typical crossover moves from 20% to 80% in the time it takes to finish a coffee.
Reliable Network
Redundant power paths, surge protection and hot-swappable modules mean a single fault never takes a site offline.
24x7 Support
Real humans on the line at 3am. Average first response under ninety seconds, on call and in-app.
Live Monitoring
Every connector streams telemetry to our operations centre. Faults are usually resolved before a driver notices.
Easy Payments
UPI, cards, wallets and fleet accounts. Tap, charge, drive — the invoice lands in your inbox before you leave.
Future Ready
OCPP 2.0.1 native, ISO 15118 plug-and-charge ready, and built for bidirectional energy from day one.